Ground wire size chart
Two different NEC tables answer “what size ground wire”: the ground that runs with a circuit is sized by its breaker, and the ground to the rods is sized by the service conductors. Both are below, copper and aluminum.
Ground wire for common circuits
Equipment grounding conductor (the bare or green wire) by breaker size, from NEC Table 250.122.
| Breaker | Copper ground | Aluminum ground | Typical use |
|---|---|---|---|
| 15 A | 14 AWG | 12 AWG | Lighting, general outlets |
| 20 A | 12 AWG | 10 AWG | Kitchen, bath, garage outlets |
| 30 A | 10 AWG | 8 AWG | Dryer, water heater |
| 40 A | 10 AWG | 8 AWG | Range, 32 A EV charger |
| 50 A | 10 AWG | 8 AWG | Range, NEMA 14-50, 40 A EV charger |
| 60 A | 10 AWG | 8 AWG | 48 A EV charger, subpanel |
| 70 A | 8 AWG | 6 AWG | Subpanel, heat pump |
| 100 A | 8 AWG | 6 AWG | Subpanel feeder |
| 125 A | 6 AWG | 4 AWG | Large subpanel feeder |
| 200 A | 6 AWG | 4 AWG | 200 A feeder |
Equipment grounding conductor (NEC Table 250.122)
Find the first row at or above your breaker or fuse rating — a 30 A breaker uses the 60 A row.
| Breaker or fuse, not exceeding | Copper | Aluminum or copper-clad Al |
|---|---|---|
| 15 A | 14 AWG | 12 AWG |
| 20 A | 12 AWG | 10 AWG |
| 60 A | 10 AWG | 8 AWG |
| 100 A | 8 AWG | 6 AWG |
| 200 A | 6 AWG | 4 AWG |
| 300 A | 4 AWG | 2 AWG |
| 400 A | 3 AWG | 1 AWG |
| 500 A | 2 AWG | 1/0 AWG |
| 600 A | 1 AWG | 2/0 AWG |
| 800 A | 1/0 AWG | 3/0 AWG |
| 1,000 A | 2/0 AWG | 4/0 AWG |
| 1,200 A | 3/0 AWG | 250 kcmil |
| 1,600 A | 4/0 AWG | 350 kcmil |
| 2,000 A | 250 kcmil | 400 kcmil |
| 2,500 A | 350 kcmil | 600 kcmil |
| 3,000 A | 400 kcmil | 600 kcmil |
Shown to 3,000 A; the code table continues to 6,000 A for large commercial and industrial services.
Upsized the hots for voltage drop? Upsize the ground too
NEC 250.122(B): when the hot conductors are made larger than the minimum to cut voltage drop on a long run, the equipment ground must grow by the same ratio of circular-mil area. Most charts skip this rule, and it is the one that catches long subpanel and detached-garage feeders.
Example: a 50 A feeder would normally use 8 AWG copper hots (16,510 circular mils) with a 10 AWG copper ground (10,380 cmil). Over a long run you step the hots up to 6 AWG (26,240 cmil), a factor of 1.59. The ground must then be at least 10,380 × 1.59 = 16,500 cmil, which is 8 AWG copper, not 10.
The ground never has to be larger than the circuit's own hot conductors (NEC 250.122(A)). Circular-mil areas are from NEC Chapter 9, Table 8. Check a run with the voltage drop calculator.
Grounding electrode conductor (NEC Table 250.66)
The wire from the service equipment to the ground rods, concrete-encased (Ufer) electrode or water pipe. Sized by the largest hot service-entrance conductor, not the breaker.
| Service conductor, copper | Service conductor, aluminum | Copper GEC | Aluminum GEC |
|---|---|---|---|
| 2 AWG or smaller | 1/0 AWG or smaller | 8 AWG | 6 AWG |
| 1 or 1/0 AWG | 2/0 or 3/0 AWG | 6 AWG | 4 AWG |
| 2/0 or 3/0 AWG | 4/0 AWG or 250 kcmil | 4 AWG | 2 AWG |
| Over 3/0 AWG – 350 kcmil | Over 250 – 500 kcmil | 2 AWG | 1/0 AWG |
| Over 350 – 600 kcmil | Over 500 – 900 kcmil | 1/0 AWG | 3/0 AWG |
| Over 600 – 1100 kcmil | Over 900 – 1750 kcmil | 2/0 AWG | 4/0 AWG |
| Over 1100 kcmil | Over 1750 kcmil | 3/0 AWG | 250 kcmil |
- A typical 200 A dwelling service on 2/0 copper or 4/0 aluminum needs a 4 AWG copper grounding electrode conductor.
- To ground rods, pipe or plate electrodes alone, the conductor never has to be larger than 6 AWG copper or 4 AWG aluminum (NEC 250.66(A)).
- To a concrete-encased (Ufer) electrode alone, it never has to be larger than 4 AWG copper (NEC 250.66(B)).
Notes
- Values are code minimums from the 2023 NEC. Your jurisdiction may have adopted an earlier edition or local amendments.
- Table 250.122 is a floor: the ground must also be large enough to clear a fault quickly (NEC 250.4), which can call for a larger conductor on very long runs.
- Grounding and bonding errors are a shock and fire hazard. Have a licensed electrician do the work and pull the permit, and confirm with your local authority having jurisdiction (AHJ).