Cost to Charge a 2024 GMC Sierra EV
Charging a 2024 GMC Sierra EV from 10% to 80% at home costs about $26.28 at the U.S. average electricity rate (16.5¢/kWh). A full 205 kWh charge is roughly $37.54, or about $8.53 per 100 miles. Use the calculator below for your own rate.
Full charge (home)
$37.54
205 kWh @ 16.5¢/kWh
Per 100 miles
$8.53
440 mi EPA range
10–80% top-up
$26.28
Most common charge
Charging cost by electricity rate
What it costs to charge the GMC Sierra EV at three representative U.S. rates.
| Charge window | Washington11.9¢/kWh | U.S. average16.5¢/kWh | California32.0¢/kWh |
|---|---|---|---|
| 10% → 80% (typical top-up) | $18.97 | $26.28 | $50.97 |
| 20% → 80% (fast-charge stop) | $16.26 | $22.52 | $43.69 |
| 0% → 100% (full charge) | $27.11 | $37.54 | $72.82 |
Calculate your exact cost
Battery is pre-filled to the GMC Sierra EV's 205 kWh. Enter your own electricity rate.
Loading calculator…
Frequently asked questions
At the U.S. average residential rate of 16.5¢/kWh, a full 0–100% charge of the 2024 GMC Sierra EV's 205 kWh battery costs about $37.54. A typical 10–80% top-up is roughly $26.28. Your cost depends on your local electricity rate — enter it above.