Skip to content

EV Charger Installers in Indiana

Find EV charger installers in Indiana. We've gathered 5 electricians and EV charging companies from across Indiana with their phone number, address, hours, and Google rating — so you can compare and reach out for quotes. With residential electricity averaging 14.8¢/kWh in Indiana, a properly installed Level 2 charger lets you fill up at home for a fraction of public charging.

5 EV charger installers in Indiana

Spread across Indiana so there's likely one near you. Details from public Google Business Profiles — verify before hiring.

McCormick Electrical Services, Inc.

4.8(1141)
Hours· tap to view
  • Monday8AM-4:30PM
  • Tuesday8AM-4:30PM
  • Wednesday8AM-4:30PM
  • Thursday8AM-4:30PM
  • Friday8AM-4:30PM
  • SaturdayClosed
  • SundayClosed

Evansville Electrician Guys

5.0(22)
Hours· tap to view
  • Monday8AM-9PM
  • Tuesday8AM-9PM
  • Wednesday8AM-9PM
  • Thursday8AM-9PM
  • Friday8AM-9PM
  • Saturday8AM-9PM
  • Sunday11AM-6PM

Uber Energy

5.0(103)
Hours· tap to view
  • Monday8AM-6PM
  • Tuesday8AM-6PM
  • Wednesday8AM-6PM
  • Thursday8AM-6PM
  • Friday8AM-6PM
  • SaturdayClosed
  • SundayClosed

Home Electric

4.9(225)
Hours· tap to view
  • Monday8AM-6PM
  • Tuesday8AM-6PM
  • Wednesday8AM-6PM
  • Thursday8AM-6PM
  • Friday8AM-6PM
  • Saturday8AM-6PM
  • SundayClosed

Absolute Electric & Maintenance LLC

5.0(31)

How to choose an EV charger installer in Indiana

Hire a licensed electrician (NEC 625)

A Level 2 charger is a 240V branch circuit, so the work must be done by an electrician licensed in Indiana and follow NEC Article 625, which governs electric-vehicle supply equipment. Confirm they carry liability insurance and a labor warranty on the install — not just the manufacturer's warranty on the charger itself.

Check your panel can handle the new 240V circuit

A good installer runs a load calculation before quoting. A Level 2 charger typically needs a dedicated 40–60A double-pole breaker, and an older or fully-loaded panel may need a subpanel or a service upgrade. Ask whether your panel has the spare capacity or whether the quote includes panel work — it's the single biggest cost variable.

Confirm the permit, inspection & hardwired vs. plug-in

A reputable contractor pulls the electrical permit and schedules the Indiana inspection — skipping it can void insurance and fail at resale. Decide between a hardwired charger (cleaner, supports higher amperage, often required outdoors) and a NEMA 14-50 outlet (plug-in, portable). Both are valid; make sure the quote states which you're getting.

Listing data is sourced from public Google Business Profiles and may be out of date. WattSimple is not affiliated with, and does not endorse or recommend, any listed company. Verify licensing and details directly before hiring.

Frequently asked questions

Use a licensed electrician — installing a Level 2 charger is 240V electrical work governed by NEC Article 625. Confirm they pull the permit and schedule the inspection Indiana requires, carry liability insurance, and run a load calculation on your panel before quoting. Get a few written quotes and compare exactly what's included (circuit length, breaker, the charger unit, and any panel work).

Plan your EV charger install

All statesEV charger breaker sizing guide