Skip to content

EV Charger Installers in Minnesota

Find EV charger installers in Minnesota. We've gathered 12 installers from across Minnesota with their phone number, address, hours, and Google rating, so you can compare and reach out for quotes. Listings span Hamel, Moorhead, Duluth, Rochester, Mankato and St Cloud and more, so there's likely an electrician near you. The installers below average 4.7 stars on Google. With residential electricity averaging 15.4¢/kWh in Minnesota, a properly installed Level 2 charger lets you fill up at home for a fraction of public charging.

Before you hire in Minnesota: price your install

Minnesota at a glance

15.4¢
per kWh, residential

#20 most expensive of 51

$110.06
average monthly bill

EIA, 2024 annual avg

712 kWh
average monthly use

EIA, 2024 annual avg

$9.27
to add 60 kWh at home

Roughly 200–250 miles of range at 15.4¢/kWh

12 EV charger installers in Minnesota

Spread across Minnesota so there's likely one near you. Enter your ZIP above to sort nearest-first, or tap a pin on the map. Details from public Google Business Profiles: verify before hiring.

Norske Electric · Hamel1Grace Electric · Moorhead2Star Power Electric · Duluth3Winkels Electric Inc · Rochester4Schwickert's Electrical · Mankato5Nies Electric · St Cloud6John Kivel Electric, LLC · Woodbury7Lakeville Electric Inc · Lakeville8Minneapolis Electricians · Minneapolis9Gunnar Electric, Inc · Eden Prairie10Super Electric · St Paul11Kuntz Electric, Inc. · Rochester12
12 pins · numbers match the cards

How to choose an EV charger installer in Minnesota

Hire a licensed electrician (NEC 625)

A Level 2 charger is a 240V branch circuit, so the work must be done by an electrician licensed in Minnesota and follow NEC Article 625, which governs electric-vehicle supply equipment. Confirm they carry liability insurance and a labor warranty on the install, not just the manufacturer's warranty on the charger itself.

Check your panel can handle the new 240V circuit

A good installer runs a load calculation before quoting. A Level 2 charger typically needs a dedicated 40–60A double-pole breaker, and an older or fully-loaded panel may need a subpanel or a service upgrade. Ask whether your panel has the spare capacity or whether the quote includes panel work: it's the single biggest cost variable.

Confirm the permit, inspection & hardwired vs. plug-in

A reputable contractor pulls the electrical permit and schedules the Minnesota inspection: skipping it can void insurance and fail at resale. Decide between a hardwired charger (cleaner, supports higher amperage, often required outdoors) and a NEMA 14-50 outlet (plug-in, portable). Both are valid; make sure the quote states which you're getting.

What to know before hiring in Minnesota

The largest utilities serving Minnesota homes are Northern States Power Co - Minnesota (1,230,057 residential customers, 17.0¢/kWh), Connexus Energy (134,095 residential customers, 13.7¢/kWh) and ALLETE (125,896 residential customers, 15.7¢/kWh). Your utility sets the rate your charging costs, and it is also who an installer files interconnection or service paperwork with, so name it when you ask for quotes.

Check the license before you sign

Electrical contractors in Minnesota are licensed by the Minnesota Department of Labor and Industry. Electrical contractor license plus Master and Journeyworker electrician licenses.

Look up a licenseBoard siteLinks checked 2026-10-19

Listing data is sourced from public Google Business Profiles and may be out of date. WattSimple is not affiliated with, and does not endorse or recommend, any listed company. Verify licensing and details directly before hiring.

The charger side of the install

Most electricians will install a charger you supply, and the circuit follows the charger: a 48 A hardwired unit needs a 60 A circuit, a 40 A plug-in unit a 14-50 on a 50 A circuit. Choose it before the quote so the quote matches. Most non-Tesla EVs built before 2025 have a J1772 port; a NACS car takes the wall charger's NACS version. The portable unit plugs into an existing 14-50 outlet on a 50 A circuit with no install. It is J1772-only.

We earn a commission if you buy through links on this page, at no extra cost to you. It does not change what we recommend. See our affiliate disclosure. As an Amazon Associate I earn from qualifying purchases.

All Level 2 charger picks

Other energy pros in Minnesota

Frequently asked questions

Use a licensed electrician: installing a Level 2 charger is 240V electrical work governed by NEC Article 625. Confirm they pull the permit and schedule the inspection Minnesota requires, carry liability insurance, and run a load calculation on your panel before quoting. Get a few written quotes and compare exactly what's included (circuit length, breaker, the charger unit, and any panel work).

Plan your EV charger install

All statesEV charger breaker sizing guideAll installer directories
Cite or link to this pageAPA · MLA · Chicago · HTML

Free to cite, quote and link. Copy a ready-made citation: the link back is all we ask.

APA

WattSimple. (2026, June 21). EV Charger Installers in Minnesota. https://wattsimple.com/ev-charger-installers/minnesota

MLA

"EV Charger Installers in Minnesota." WattSimple, 21 June 2026, https://wattsimple.com/ev-charger-installers/minnesota.

Chicago

WattSimple. "EV Charger Installers in Minnesota." Last modified June 21, 2026. https://wattsimple.com/ev-charger-installers/minnesota.

HTML link

<a href="https://wattsimple.com/ev-charger-installers/minnesota">EV Charger Installers in Minnesota</a> (WattSimple)