Skip to content

EV Charger Installers in Washington

Find EV charger installers in Washington. We've gathered 12 electricians and EV charging companies from across Washington with their phone number, address, hours, and Google rating — so you can compare and reach out for quotes. Listings span Seattle, Spokane, Vancouver, Bellingham, Olympia and Arlington and more, so there's likely an electrician near you. The installers below average 4.9 stars on Google. With residential electricity averaging 11.9¢/kWh in Washington, a properly installed Level 2 charger lets you fill up at home for a fraction of public charging.

Before you hire in Washington — price your install

12 EV charger installers in Washington

Spread across Washington so there's likely one near you. Details from public Google Business Profiles — verify before hiring.

As You Wish Electric, Plumbing, Heating & Air

4.9(3271)
Hours· tap to view
  • MondayOpen 24 hours
  • TuesdayOpen 24 hours
  • WednesdayOpen 24 hours
  • ThursdayOpen 24 hours
  • FridayOpen 24 hours
  • SaturdayOpen 24 hours
  • SundayOpen 24 hours

Wired Goat Electric

5.0(56)
Hours· tap to view
  • Monday7AM-8PM
  • Tuesday7AM-8PM
  • Wednesday7AM-8PM
  • Thursday7AM-8PM
  • Friday7AM-8PM
  • Saturday7AM-8PM
  • Sunday7AM-8PM

West Coast Electric, Inc.

4.9(101)
Hours· tap to view
  • Monday8AM-4PM
  • Tuesday8AM-4PM
  • Wednesday8AM-4PM
  • Thursday8AM-4PM
  • Friday8AM-4PM
  • SaturdayClosed
  • SundayClosed

Pro Circuit Electrical

4.9(111)
Hours· tap to view
  • Monday7:30AM-5:30PM
  • Tuesday7:30AM-5:30PM
  • Wednesday7:30AM-5:30PM
  • Thursday7:30AM-5:30PM
  • FridayClosed
  • SaturdayClosed
  • SundayClosed

Circuit Solutions Electric LLC

4.9(62)
Hours· tap to view
  • Monday8AM-7PM
  • Tuesday8AM-7PM
  • Wednesday8AM-7PM
  • Thursday8AM-7PM
  • Friday8AM-7PM
  • Saturday9AM-5PM
  • Sunday9AM-5PM

Skyline Electrical Services

4.9(203)
Hours· tap to view
  • Monday9AM-5PM
  • Tuesday9AM-5PM
  • Wednesday9AM-5PM
  • Thursday9AM-5PM
  • Friday9AM-5PM
  • SaturdayClosed
  • SundayClosed

Kanon Electric Inc

4.8(688)
Hours· tap to view
  • Monday8AM-5PM
  • Tuesday8AM-5PM
  • Wednesday8AM-5PM
  • Thursday8AM-5PM
  • Friday8AM-5PM
  • SaturdayClosed
  • SundayClosed

Switch Electric Home Energy

5.0(734)
Hours· tap to view
  • Monday8:30AM-4:30PM
  • Tuesday8:30AM-4:30PM
  • Wednesday8:30AM-4:30PM
  • Thursday8:30AM-4:30PM
  • Friday8:30AM-4:30PM
  • SaturdayClosed
  • SundayClosed

BT Solutions

4.8(57)
Hours· tap to view
  • Monday8AM-5PM
  • Tuesday8AM-5PM
  • Wednesday8AM-5PM
  • Thursday8AM-5PM
  • Friday8AM-5PM
  • SaturdayClosed
  • SundayClosed

Surge Electrical LLC

4.9(212)
Hours· tap to view
  • Monday7AM-9PM
  • Tuesday7AM-9PM
  • Wednesday7AM-9PM
  • Thursday7AM-9PM
  • Friday7AM-9PM
  • Saturday7AM-9PM
  • Sunday7AM-9PM

In-House Electrical Services

4.9(880)
Hours· tap to view
  • MondayOpen 24 hours
  • TuesdayOpen 24 hours
  • WednesdayOpen 24 hours
  • ThursdayOpen 24 hours
  • FridayOpen 24 hours
  • SaturdayOpen 24 hours
  • SundayOpen 24 hours

Phase NW Electricians

5.0(193)
Hours· tap to view
  • Monday8AM-4PM
  • Tuesday8AM-4PM
  • Wednesday8AM-4PM
  • Thursday8AM-4PM
  • Friday8AM-4PM
  • SaturdayClosed
  • SundayClosed

How to choose an EV charger installer in Washington

Hire a licensed electrician (NEC 625)

A Level 2 charger is a 240V branch circuit, so the work must be done by an electrician licensed in Washington and follow NEC Article 625, which governs electric-vehicle supply equipment. Confirm they carry liability insurance and a labor warranty on the install — not just the manufacturer's warranty on the charger itself.

Check your panel can handle the new 240V circuit

A good installer runs a load calculation before quoting. A Level 2 charger typically needs a dedicated 40–60A double-pole breaker, and an older or fully-loaded panel may need a subpanel or a service upgrade. Ask whether your panel has the spare capacity or whether the quote includes panel work — it's the single biggest cost variable.

Confirm the permit, inspection & hardwired vs. plug-in

A reputable contractor pulls the electrical permit and schedules the Washington inspection — skipping it can void insurance and fail at resale. Decide between a hardwired charger (cleaner, supports higher amperage, often required outdoors) and a NEMA 14-50 outlet (plug-in, portable). Both are valid; make sure the quote states which you're getting.

Listing data is sourced from public Google Business Profiles and may be out of date. WattSimple is not affiliated with, and does not endorse or recommend, any listed company. Verify licensing and details directly before hiring.

Frequently asked questions

Use a licensed electrician — installing a Level 2 charger is 240V electrical work governed by NEC Article 625. Confirm they pull the permit and schedule the inspection Washington requires, carry liability insurance, and run a load calculation on your panel before quoting. Get a few written quotes and compare exactly what's included (circuit length, breaker, the charger unit, and any panel work).

Plan your EV charger install

All statesEV charger breaker sizing guide