Skip to content

EV Charger Installers in Oregon

Find EV charger installers in Oregon. We've gathered 12 installers from across Oregon with their phone number, address, hours, and Google rating, so you can compare and reach out for quotes. Listings span Portland, Klamath Falls, Bend, Roseburg, Corvallis and Ashland and more, so there's likely an electrician near you. The installers below average 4.7 stars on Google. With residential electricity averaging 14.7¢/kWh in Oregon, a properly installed Level 2 charger lets you fill up at home for a fraction of public charging.

Before you hire in Oregon: price your install

Oregon at a glance

14.7¢
per kWh, residential

#28 most expensive of 51

$129.62
average monthly bill

EIA, 2024 annual avg

882 kWh
average monthly use

EIA, 2024 annual avg

$8.82
to add 60 kWh at home

Roughly 200–250 miles of range at 14.7¢/kWh

How to choose an EV charger installer in Oregon

Hire a licensed electrician (NEC 625)

A Level 2 charger is a 240V branch circuit, so the work must be done by an electrician licensed in Oregon and follow NEC Article 625, which governs electric-vehicle supply equipment. Confirm they carry liability insurance and a labor warranty on the install, not just the manufacturer's warranty on the charger itself.

Check your panel can handle the new 240V circuit

A good installer runs a load calculation before quoting. A Level 2 charger typically needs a dedicated 40–60A double-pole breaker, and an older or fully-loaded panel may need a subpanel or a service upgrade. Ask whether your panel has the spare capacity or whether the quote includes panel work: it's the single biggest cost variable.

Confirm the permit, inspection & hardwired vs. plug-in

A reputable contractor pulls the electrical permit and schedules the Oregon inspection: skipping it can void insurance and fail at resale. Decide between a hardwired charger (cleaner, supports higher amperage, often required outdoors) and a NEMA 14-50 outlet (plug-in, portable). Both are valid; make sure the quote states which you're getting.

What to know before hiring in Oregon

The largest utilities serving Oregon homes are Portland General Electric (828,857 residential customers, 18.2¢/kWh), PacifiCorp (547,235 residential customers, 14.0¢/kWh) and City of Eugene (89,582 residential customers, 13.1¢/kWh). Your utility sets the rate your charging costs, and it is also who an installer files interconnection or service paperwork with, so name it when you ask for quotes.

Check the license before you sign

Electrical contractors in Oregon are licensed by the Oregon Building Codes Division. Electrical contractor (business) and individual electrician licenses; general contractors register separately with the CCB.

Look up a licenseBoard siteLinks checked 2026-10-19

Listing data is sourced from public Google Business Profiles and may be out of date. WattSimple is not affiliated with, and does not endorse or recommend, any listed company. Verify licensing and details directly before hiring.

The charger side of the install

Most electricians will install a charger you supply, and the circuit follows the charger: a 48 A hardwired unit needs a 60 A circuit, a 40 A plug-in unit a 14-50 on a 50 A circuit. Choose it before the quote so the quote matches. Most non-Tesla EVs built before 2025 have a J1772 port; a NACS car takes the wall charger's NACS version. The portable unit plugs into an existing 14-50 outlet on a 50 A circuit with no install. It is J1772-only.

We earn a commission if you buy through links on this page, at no extra cost to you. It does not change what we recommend. See our affiliate disclosure. As an Amazon Associate I earn from qualifying purchases.

All Level 2 charger picks

Other energy pros in Oregon

Frequently asked questions

Use a licensed electrician: installing a Level 2 charger is 240V electrical work governed by NEC Article 625. Confirm they pull the permit and schedule the inspection Oregon requires, carry liability insurance, and run a load calculation on your panel before quoting. Get a few written quotes and compare exactly what's included (circuit length, breaker, the charger unit, and any panel work).

Plan your EV charger install

All statesEV charger breaker sizing guideAll installer directories
Cite or link to this pageAPA · MLA · Chicago · HTML

Free to cite, quote and link. Copy a ready-made citation: the link back is all we ask.

APA

WattSimple. (2026, June 21). EV Charger Installers in Oregon. https://wattsimple.com/ev-charger-installers/oregon

MLA

"EV Charger Installers in Oregon." WattSimple, 21 June 2026, https://wattsimple.com/ev-charger-installers/oregon.

Chicago

WattSimple. "EV Charger Installers in Oregon." Last modified June 21, 2026. https://wattsimple.com/ev-charger-installers/oregon.

HTML link

<a href="https://wattsimple.com/ev-charger-installers/oregon">EV Charger Installers in Oregon</a> (WattSimple)